Philippines Arayat 3A 42MWp Solar Power Plant Project

Project Time:

2022

Project Introduction:

Project Overview:
• 42MWp utility-scale solar facility in Pampanga
• 69kV substation with direct NGCP grid interconnection
• Developed by CITICORE Renewable Energy (CREC)
• Designed for tropical climate conditions

SINOPOWR's Integrated Solution:
✔ 4 Sets of Dual-Voltage Thyristor DC Power Systems (48V/125V)
✔ 10KVA Uninterruptible Power Supply (UPS) System
✔ Weatherproof Pad-Mounted Transformers
✔ End-to-End Installation & Commissioning Services



Technical Advantages:

• IEC-certified power conversion equipment
• Climate-optimized components (humidity/heat resistant)
• Redundant power supply configuration
• Seamless grid synchronization


Why Clients Choose Us:

Why Clients Choose Us:
✓ Local technical support teams
✓ Fast-track project execution
✓ Compliance with NGCP grid standards