Project Name:

Honduras san buenaventura- san pedro sula South 230 Transmission Line

Project Time:

2022

Project Introduction:

Overview

    • 230-kilovolt transmission line

    • Designed transmission capacity: 250 MVA

    • Total Line Length: 275.05 km

    • Transmission Towers: 727



Routes:

Southern Route (~114 km): Valle & Choluteca departments (bordering El Salvador & Nicaragua).
Northern Route (~156 km): Mountainous areas of Santa Bárbara, Copán, and part of Cortés. Starts near Río Lindo substation, runs through Santa Bárbara, and ends in Copán connecting to Guatemala.
Scope: Design, supply of Steel Towers , Hardware and fittings, and guidance of installation, commissioning, on site testing, training and etc.